Mobile splicing LED display installation to meet what requirements?

  As we all know, the installation of mobile splicing LED display and ordinary LED display installation, is different. Therefore, the installation of mobile splicing LED display must be treated differently from ordinary LED display, but need to meet its relevant installation requirements to ensure the smooth progress of mobile splicing LED display installation work. So you knowMobile splicing LED displayInstallation to meet what requirements? The following VisiTech editorial is for you to introduce:


移动拼接LED显示屏安装要满足哪些要求?


  Mobile splicing LED display installation should meet the following requirements:


  1. Wiring requirements:


  When installing mobile splicing LED display, pay attention to distinguish its power and signal lines when wiring and install them in different locations to avoid interference. In addition, calculate the lengths and specifications of the various wires required according to the screen size and installation location of the whole project, and calculate the needs of the whole project.


  2. Framework requirements:


  In order to facilitate future maintenance of the mobile splicing LED display, the frame edges are removable. There should be a gap of about 25mm between the inner edge of the outer frame and each side of the outer edge of the wall combination, for large wall combinations, according to the number of columns should be increased appropriately. In addition, in order to facilitate later access to the box for maintenance, the access channel is in principle not less than 1.2m wide. For the removable edge strips, try to press the edge of the screen by 3-5mm. after the box and screen are fully installed in place, the removable edge strips can thus be better fixed.


  3. Ventilation requirements:


  Air conditioners or air vents should be installed in the maintenance channel to ensure that the mobile splicing LED display is well ventilated. The air outlet should be as far away from the LCD splicing wall as possible (about 1m in length), and the air at the outlet should not be blown directly to the box, so as not to damage the screen due to uneven heating and cooling.


  4. Environmental requirements:


  Although the brightness of the mobile splicing LED display is very high, but after all, it is still limited, so the light around the selected installation environment should not be too strong. If it is too strong, the screen may not be visible. Lights that may enter the vicinity of the screen (e.g., windows) should be blocked if necessary, and the lights should be turned off when the equipment is running to ensure proper operation. Do not mount the light directly in front of the screen, just install the barrel light.


  5. Installation site requirements:


  The installation floor of the mobile splicing LED display should be flat because the volume and weight of the whole system of the mobile splicing LED display are relatively large. The chosen floor also needs to have a certain load-bearing capacity. If the floor is tiled, it may not be able to bear its weight. Another point is that the installed floor should be anti-static.


  In summary, is the mobile splicing LED display installation to meet some of the requirements. We must meet the above requirements when installing mobile splicing LED display, otherwise it is likely to bring trouble, and even lead to mobile splicing LED display installation work can not be carried out smoothly.

Related News

TOP